2019 SIT Technical Workshop
Event Dates: September 9th - 12th, 2019
The 2019 SIT Technical Workshop
9-12 September 2019, Fairbanks, Alaska
- Logistics Information
- Map: Pike’s Waterfront Lodge to Nenana Parking Lot
- Directions to Nenana Parking Lot (general, daily metered parking): Depart Pikes Lodge parking lot by taking a left onto Airport Way. At the intersection of Airport Way and University Ave take a left onto University Ave. Cross over the University Ave / Geist Rd intersection and continue straight. Stay in the left lane. At the next intersection you will turn left onto College Rd / Alumni Dr. You will enter campus and begin a slight up hill. At the stop sign continue straight on Alumni Dr, it will turn into Tanana Loop E. Keep going straight for roughly 500/1000 feet. You will see a large gravel parking lot on the left. This is the Nenana Parking lot. There are two entrances, turn left into either. You will need to find the blue kiosk (located at teh far end of the parking lot) and buy a daily parking pass ($5.00 per day). Place this on your dash so it is visible. You can then either 1) Wait at the shuttle stop and take the NENANA ROUTE shuttle to the Wood Center (7 minute loop) or 2) you can walk (roughly 15 min up hill). *Shuttle buses run Mon –Friday from 7:30am through 6:00pm
- UAF Campus Map General Parking
- CEOS SIT TW 2019 Agenda v1.1
- Minutes Documents: Full Minutes | Actions Table
- UPDATED Side Meeting Schedule (9.3.19)
- Presentation Template | Presentation Template 16:9
- Group Photo
VC/WG/AHT Day Presentations
- Introduction (Volz)
- WGST (Killough)
- OVCMST (Casey)
- VC Rotation (Sawyer)
- AHT Lifecycle (Sawyer)
- Data Exploitation (Albani)
- ARD Strategy (Held)
- GHG Roadmap (Crisp/Dowell)
- Coasts (DiGiacomo)
Documents
- 2018 CEOS SIT Strategic Direction Discussion Paper v1
- 2019 CEOS SIT Addendum WG-VC Paper_V1.0
- CEOS Governance and Processes (rev 2019)
- Virtual Constellations Process Paper (rev 2019)
- VC and AHT Changes Summary (9.3.19 track changes)
- [Item 3.2] WGST Response v8
- [Item 3.3] OVCMST Assessment v1.1 8.27.19
- [Item 4.6] WG Disasters ToR 2019 v5
- [Item 5.1] GEO AQ Constellation Geophysical Validation Needs 1.0 (11 Sept 2019)
- [Item 6.2] CEOS Response to GEOGLAM Requirements 2019 (DRAFT)
- [Item 8.4] CEOS Analysis Ready Data Strategy (DRAFT SIT-TW, 7-9-2019)
TW Presentations
Session 1 | Session 2 | Session 3 | Session 4 | Session 5 | Session 6 | Session 7 | Session 8 |